Condition Assessments

 
 
E&M Engineering has been involved in the assessments of equipment and systems in numerous locations.
Initially the work involves the survey of the location to determine to viability and life expectancy of existing equipment.
Then based on the program for the renovation or expansion, E&M evaluates if the existing equipment and systems can be used for the new purpose or needs to be replaced. The end result is a report describing the conditions as they exist along with the recommendations for the future.
 
 

Chestnut Hill College - Greenfield Mansion
Philadelphia, PA

MEP evaluation newly acquired 12,000 SF building.

Congregation Beth Chaim
Princeton Junction , NJ

Conditions assessment of existing building with recommendation for improvements. Options expored included providing emergency power for the dining facility.

Germantown Academy Building
Fort Washington, PA

Conditions Assessment with evaluation and recommendations
for HVAC, electrical and plumbing systems for multiple building
in a total of 260,000 SF.

Kennett High School
Philadelphia, PA

Recommendations for the replacement of unit ventilators.

Feasibility Study to add AC to five (5) building. Results of study progressed to
design for three (3) building.

Parent Infant Center (PIC)
Philadelphia, PA

Study to upgrade of HVAC, electrical and plumbing for renovation of
20,000 SF for use as a daycare and after school care center.

Paterson Independence House
Paterson, NJ

MEP/FP renovation of historic 1800's locomotive administration building
12,000 SF, 3-stories into dormitories.

Penn State University - Berks Campus
Reading, PA

Building condition assessment and evaluation for student center,
gymnasium and classroom building to determine useful life and replacement
cost for MEP systems.

Radisson Hotel Neshiminy Interplay
Neshiminy, PA

Analysis of domestic hot water system deficiencies with recommendations
for improvements at a multiform hotel.

Rose Tree Media School - Glenwood Elementary
Media, PA

HVAC peer review and value engineering assessment.

Rowan University - Site Steam
Glassboro, NJ

Complete analysis of site steam piping with recommendations for new piping mains.

Sadie Tanner Mossell Alexander School
Philadelphia, PA

MEP/FP for 90,000 SF new K-8 grade technology rich demonstration school linking University of Pennsylvania with the School District of Philadelphia. Complete with cafeteria, gymnasium and lighting parking lot.

Saint Bede the Venerable Parish
Holland, PA

Schematic MEP design for the addition of 10,000 SF to the building including the expansion of the altar area and the Narthex.

School District of Philadelphia
Philadelphia, PA

Condition Assessment - Survey, evaluation and upgrade recommendations for over eighty (80) high school, middle school and elementary schools for the district 6.8 million SF. Assessments will form the basis for a $1.5 billion Capital Improvement Program.

Sigma Phi Epsilon House - University of Pennsylvania
Philadelphia, PA

Feasibility study and concept design for 4-story fraternity house at
University of Pennsylvania.

Tredyffrin Easttown School District
Wayne, PA

Facilities audit condition assessment with evaluation and recommendations for
HVAC, electrical and plumbing systems in ten (10) classroom buildings.

University of Pennsylvania Pre K-8 New School
Philadelphia, PA

Evaluation and recommendation of MEP systems for library, church, and classroom building for possible reuse as a mixed use/classroom building.

William Paterson University - Campus Lighting Upgrade
Wayne, PA

Survey of all thirteen (13) buildings on campus interior lighting and recommendations for energy upgrades and/or replacements.

2773 Philmont Avenue • Huntingdon Valley, PA 19006 • (215) 947-4562 (ph) • (215) 947-6014 (fx) • Email E&M
Web site and all contents Copyright YourName 2005, All rights reserved. Free website templates
HOME WHAT'S NEWOUR ENGINEERS FIRM PORTFOLIOON THE BOARDS IN CONSTRUCTION AWARDS CONTACT US