BRYN MAWR
FILM INSTITUTE
Bryn Mawr, PA
 

Mechanical (HVAC, plumbing and fire protection) and Electrical (power and lighting) Engineering Services for the 2 stadium style theatre additions, renovation of the existing 2 traditional theaters and renovation of the lobby to allow for the addition.

 
BRYN MAWR
PRESBYTERIAN CHURCH
Bryn Mawr, PA
  Renovation of the bell tower at the prestigious main line church. Demolition of exhaust fan and piping. Relocation of storm water piping and electrical conduits. New lighting in spiral stair tower leading up 90 feet.
 

CAMBRIDGE HOPEWELL SPECIAL CARE
Pittsburgh, PA

 
MEP/FP design for adaptive reuse of an Assisted Living facility into a Long Term Pediatric Nursing Care facility. The building is a 35,000 square foot, 2-story building. Estimated MEP/FP construction cost $1.2 million.
CAMDEN COUNTY
TECHNICAL SCHOOL
Pennsauken, NJ
  Toilet room renovation of 9 rooms from locker rooms with open stalls to public toilet rooms with enclosed stalls. Works included plumbing fixtures, piping, exhaust system connections, lighting and fire alarm devices.
CARPENTER SQUARE
Philadelphia, PA
  MEP/FP Engineering Services for the mixed use Carpenter Square. Complex to consist of 11 4-story Townhouses and a 4 story mixed use building with lower level and first floor commercial space and Apartments above. HVAC systems to be Geothermal.
HILL SCHOOL
ALUMNI MEMORIAL
CHAPEL
Pottstown, PA
 

Mechanical, electrical and plumbing renovations to the main level sacristy and creation of a bridal suite on the lower level with toilet facilities. Improvements to the Chapel with large scale ceiling fans.

PHILADELPHIA
WATER DEPARTMENT SOUTHEAST PLANT

Philadelphia, PA
  Electrical engineering for the bar rack replacement project. Work includes survey for demolition and power sources for replacement equipment including the screens, sluice gate actuator and lighting. All work within the bar rack room is to be Class 1, Division 1, Group D for explosive, hazardous locations. Project was part of an on-call contract for the Philadelphia Water Department.
PLYMOUTH MEETING
FRIENDS SCHOOL
Plymouth Meeting, PA
  HVAC, plumbing, electrical and fire protection design for a new approximately 8,000 SF administration building. Design will also show two classrooms.
PROJECT HOME
Philadelphia, PA
  MEP/FP for a new 22,000 square feet Wellness Center including medical and dental offices, pharmacy, community room, YMCA exercise facility and childcare facility.
VILLANOVA UNIVERSITY
SCHOOL OF LAW
Philadelphia, PA
  MEP renovation of offices into Conference Center with 2 offices, lounge, kitchen and video presentation room.
WEST CHESTER
VILLAGE
West Chester, PA
  MEP/FP design/built narratives for the 3-story 5 building apartment style dormitory complex. Each apartment to have 4 bedrooms, a kitchen, living room and toilet/shower rooms. One building to have a common room and space for the geothermal equipment. Buildings to be completely wireless for data. Security systems to include card access and CCTV digital cameras to be monitored by campus police and outside security company. Design includes geothermal well field.
WILLINGBORO
SCHOOL DISTRICT
Willingboro, NJ
  Willingboro SD - Toilet room renovations of 4 ganged toilet rooms in five Willingboro District Elementary Schools, J Cresswell Stuart Elementary School, Twin Hills Elementary School, Garfield Park East Elementary School, Hawthorne Elementary School and W.R. James Elementary School.
2773 Philmont Avenue Huntingdon Valley, PA 19006 (215) 947-4562 (ph) (215) 947-6014 (fx) Email E&M
Web site and all contents Copyright YourName 2005, All rights reserved. Free website templates
HOME WHAT'S NEWOUR ENGINEERSFIRM PORTFOLIOON THE BOARDSIN CONSTRUCTIONAWARDS CONTACT US